Recovery
New construction of a helium recovery plant
- Delivery of a Helium Recovery System
- Helium ballon 10m³
- Helium compressor (1x WP4341)
- Oil Remover System
- High Pressure Distribution Panel
- Gasmeter
- automatic distribution of gasflow with the HDP
- complete piping from process lines to high pressure storage
Realization date
12/2021Performance data
Compressor capacity: 43 m³/h
Storage Capacity GHe:
- Helium Storage 12m³ @ 200 Bar
- 1 Ballon 10m³
2 Storage groups
1 process connections
Contact
University Hamburg
Institute for experimental physics
Dr. Christoph Krieger
tel.: +49 40 8998 2964
christoph.krieger@uni-hamburg.de
Luruper Chaussee 149
22761 Hamburg