Liquefication | Recovery
New construction of a VL100 helium liquefier 34 l LHe incl. recovery system at PTB Berlin
New construction of a helium liquefaction plant incl. helium recovery
- Scope of supply helium liquefaction plant
- Cycle compressor water cooled
- Oil remover system with gas management panel
- Coldbox including expansion turbines and freeze-out purifier
- Gas dryer
- Transfer line from liquefier VL100 to stationary LHe Dewar
- Transfer line from LHe Dewar to mobile Dewars
- Automatic filling system for mobile Dewar incl. flexible transfer line
- MSR technology
- LHe Dewar 3.000 l
- Scope of supply Helium recovery system
- High-pressure compressors (2x WP4341) (2x43 Nm³/h)
- Analysis Panel Type7
- Gas Balancing HP/LP with O2-Sensor
- Helium-Balloon 1x20m3
- Oil Remover System
- 4x High Pressure Storage - 1150l @200bar
- Automatic distribution of the helium via high-pressure panels
- Installation of all system components
- Commissioning of the entire system
- Integration of the existing pure gas buffer
- Clean gas piping in the building
- Maintenance of ongoing operation during the conversion and new construction phase, no significant losses
Realization date
10/2024Performance data
- Liquefication Rate: 34 l LHe/h without LN2 pre-cooling
- Compressor el. consumption: 76 kW
Contact