Liquefication
Construction of a VL100 helium liquefier with LN2 Pre-Cooling, 42 L/h, at the University of Krakow, Poland

- Delivery of a Helium Liquefication Plant
- Cycle compressor, watercooled
- Oil Remover System with Gas Management Panel
- Coldbox incl. expansion turbines and freeze-out-purifier
- Gas dryer
- Dewar with 000L LHe capacity
- Transfer Line from VL100 to Dewar
- Scale for mobile dewars
- Process control technology (MSR)
- Gas Storage Ballons 2x15m³
- Installation of all system components
- Commissioning of the entire system
- Maintenance of ongoing operations during conversion and construction phase, no significant losses
Realization date
12/2018Performance data
- Liquefication Rate:
- 42 l LHe/h with LN2 pre-cooling
- Compressor el. consumption: 55 kW